<<Previous Page
Next Page>>
The walls were smoothened with plaster for texturing.
The drain pipe was also replaced.
During
Bathroom Remodel
  A vapor barrier was installed. New Plumbing Fixture Was Installed. The shower head and valve were raised.
A shampoo location was built.